Systeem d develops projects from places, objects, materials, techniques and existing situations.

Some begin within the practice, others through commissions or collaborations. Their final form is not fixed in advance, but develops in relation to the situation in which they are made.

Project 000 — The waiting room

Wolstraat, Antwerp — 2026 — In development

Systeem d is waiting for a permit for Repair to Launch. Until a decision is made, the space becomes The waiting room.

The duration of the project is determined by the duration of the administrative procedure.

View project

Project 001 — Repair to Launch

Wolstraat, Antwerp — 2026 — Awaiting permit

A project developed from the existing shopfront, façade and architecture of Systeem d, together with materials and visual references associated with Veritas.

Part of the intervention requires a permit. Both the timing and the final form therefore remain open.

View project


Project 002 — Caravan

Mobile project — 2026 — In development

A dark blue caravan converted into a mobile presentation space.

Its scale, structure and existing form determine how paintings, displays and spatial elements can be shown in different locations.

View project

Project 003 — Palmtrees

2025–2026 — In development

Handmade artificial palm trees and paintings come together in a temporary environment.

The first installation takes place at Systeem d. A later version may move to a tanning salon, where the same work enters a different existing context.

View project